FICTIONAL BASELINE A coordinator spends 12 minutes each day preparing a missing-files list. During five observed days, two lists needed correction after being sent. CHANGE TO TRY Generate a draft list from recorded requirements and accepted evidence. The coordinator checks it before sending. Do not change the approval policy. COMPLETE THIS EXPERIMENT Problem and baseline: One change and what remains the same: Measure: total preparation plus checking time, and corrections after sending: Owner and backup: Trial period and review date: Keep/change/stop criteria: Recovery if the generated list is wrong: Propose criteria before predicting savings. Label proposed targets as targets. Include time spent fixing mistakes; do not measure only the faster generation step.